Prefab Steel Bridge

Prefab Steel Bridge

Lightweight, quick erection for pedestrian, vehicle and temporary bridges.

预制钢桥 - 远南钢结构

Overview

How long does the coating last?

Heavy anti-corrosion coating lasts 15+ years in atmospheric environments.

Key Advantages

  • Need a Prefab Steel Bridge Quote?
  • Fast on-site assembly
  • Lightweight, lower foundation cost
  • Customizable spans
  • Durable anti-corrosion coating
  • Reusable and relocatable

Typical Technical Specs

桥型 Pedestrian / vehicle / temporary
跨径 6–30m
主梁 H-beam / box girder
防腐 Sandblast + epoxy zinc-rich
铺装 Designed by load class
工期 ~1–2 weeks on site

Applications

  • Pedestrian overpasses
  • Scenic landscape bridges
  • Temporary construction bridges
  • Agricultural bridges
  • Emergency access bridges

FAQ

What vehicle loads can it carry?

Girders designed by highway load class.

How long on site?

Erection usually takes 1–2 weeks after delivery.

How long does anti-corrosion last?

Heavy-duty coating lasts 15+ years in atmospheric conditions.

Need a Prefab Steel Bridge Quote?

Share your area and use; we reply within 24 hours.Get a Quote →

FREE QUOTE & 3D DESIGN
Engineer reply within 24 hours
Send span, length, eave height and country. No drawing yet? Size and location are enough to start.
Get Free Quote
WHATSAPP OR CALL
+84 35 336 0310
Talk to our engineer, Monday-Saturday (GMT+8).
Start Chat
EMAIL
ynsteelco1@outlook.com
Opens with the project questions pre-filled.
Write Email