Prefab Steel Bridge
Lightweight, quick erection for pedestrian, vehicle and temporary bridges.

Overview
How long does the coating last?
Heavy anti-corrosion coating lasts 15+ years in atmospheric environments.
Key Advantages
- Need a Prefab Steel Bridge Quote?
- Fast on-site assembly
- Lightweight, lower foundation cost
- Customizable spans
- Durable anti-corrosion coating
- Reusable and relocatable
Typical Technical Specs
| 桥型 | Pedestrian / vehicle / temporary |
| 跨径 | 6–30m |
| 主梁 | H-beam / box girder |
| 防腐 | Sandblast + epoxy zinc-rich |
| 铺装 | Designed by load class |
| 工期 | ~1–2 weeks on site |
Applications
- Pedestrian overpasses
- Scenic landscape bridges
- Temporary construction bridges
- Agricultural bridges
- Emergency access bridges
FAQ
What vehicle loads can it carry?
Girders designed by highway load class.
How long on site?
Erection usually takes 1–2 weeks after delivery.
How long does anti-corrosion last?
Heavy-duty coating lasts 15+ years in atmospheric conditions.
Need a Prefab Steel Bridge Quote?
Share your area and use; we reply within 24 hours.Get a Quote →
